Availability: | |
---|---|
| |
A Manila-based film production house faced chaotic storage of heavy equipment (camera cranes, lighting rigs, generator sets) across their 800m² studio. Floor clutter caused trip hazards during shoots, damaged ₱12M worth of gear annually, and forced costly off-site rentals for bulky props – crippling tight production schedules.
Shibang engineered a Heavy-Duty Mezzanine Racking System with 500KG/m² load capacity:
Industrial Decking: 3mm-thick diamond-grid steel floors (EN 10346) spanning 15m × 10m, eliminating column obstructions below.
Hybrid Access: Integrated staircases for simultaneous crew
Tropical Resilience: Humidity-resistant powder coating (RAL 9005) + anti-slip epoxy finish to withstand monsoon conditions.
Converted 70% of ceiling void into secure equipment storage (e.g., 300kg ARRI lights on upper tier), freeing 100% of ground space for active filming.
500KG/m² reinforced decks stored stacked flight cases vertically, reducing equipment damage by 90%.
Color-coded "Quick Pick" zones (e.g., red for grip gear) slashed prep time from 45 to 10 minutes per shoot.
The studio now stores 2-ton camera dollies – eliminated off-site rentals , and reduced set construction delays by 65%. The mezzanine’s open design also enables real-time inventory checks during productions.
A Manila-based film production house faced chaotic storage of heavy equipment (camera cranes, lighting rigs, generator sets) across their 800m² studio. Floor clutter caused trip hazards during shoots, damaged ₱12M worth of gear annually, and forced costly off-site rentals for bulky props – crippling tight production schedules.
Shibang engineered a Heavy-Duty Mezzanine Racking System with 500KG/m² load capacity:
Industrial Decking: 3mm-thick diamond-grid steel floors (EN 10346) spanning 15m × 10m, eliminating column obstructions below.
Hybrid Access: Integrated staircases for simultaneous crew
Tropical Resilience: Humidity-resistant powder coating (RAL 9005) + anti-slip epoxy finish to withstand monsoon conditions.
Converted 70% of ceiling void into secure equipment storage (e.g., 300kg ARRI lights on upper tier), freeing 100% of ground space for active filming.
500KG/m² reinforced decks stored stacked flight cases vertically, reducing equipment damage by 90%.
Color-coded "Quick Pick" zones (e.g., red for grip gear) slashed prep time from 45 to 10 minutes per shoot.
The studio now stores 2-ton camera dollies – eliminated off-site rentals , and reduced set construction delays by 65%. The mezzanine’s open design also enables real-time inventory checks during productions.
content is empty!
Quick Links
Other links
Contact Us